|
Still deciding? Get samples of $ !
Request Sample
|
| Customization: | Available |
|---|---|
| Type: | Clay Dry Sand |
| Casting Method: | Thermal Gravity Casting |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
| Featured Products | Power line fittings; Auto parts; Railway parts; Mechanical parts; Machinery components; Hardware, OEM forged parts |
|
| Forming Equipments | 1.300Ton,400Ton,630Ton,1600Ton Frication Press Machines | |
| 2.500Kg&1Ton Air Hammers | ||
| 3.500Ton Hydraulic Press | ||
| Machining Equipments | 1.CNC Machine Center | |
| 2.Grinding Machine | ||
| 3.Drilling&Milling Machines | ||
| 4.Lathe Machines | ||
| Inspection Instruments | 1. Spectrograph | |
| 2. Tensile testing machine | ||
| 3. Magnetic particle flaw detector | ||
| 4. Coordinate measuring machine | ||
| Forming Method | Hot closed die forging or Free forging | |
| Material Range | Carbon steel, Alloy steel, Stainless steel, Aluminum, Copper, Brass, Titanium, Nickel alloy etc | |
| Material Standard | ASTM,DIN,JIS ,BS,ISO etc | |
| Specification | As per your requirement, drawing or sample | |
| Process Capacity | Max 60Kg/pc by closed die forging; Over 200Kg/pc by open die forging. | |
| Forging Tolerance | ±0.1mm | |
| Machining Tolerance | ±0.01mm | |
| Heat Treatment | Normalizing, Tempering, Quenching, | |
| Surface Finished | Shot blasting, Hot Dip Galvanized, Electro-galvanizing, Chrome plating, Passivation etc | |
| Quality System | ISO9001:2008 | |
| Packing | Standard export packing, Non fumigation wooden case | |
| Lead Time | Generally Sample within 20~30 days and volume within 20~40 days. | |
| Annual Production | Over 10,000 Tons/year | |
| Main Clients | Ford Motor, Emerson, Samsung, DHOLLANDIA, Buhler, Energy China and so on | |
Our factory and Production process
