Factory CNC Steel Casting Cast Steel Parts Casting Processing

Product Details
Customization: Available
Casting Method: Vacuum Aspirated Casting, Vacuum Aspirated Casting
Process: Lost Wax Casting, Lost Wax Casting
Still deciding? Get samples of US$ 2.5/Piece
Request Sample
Manufacturer/Factory, Trading Company, Group Corporation
Diamond Member Since 2010

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Management System Certification
ISO 9001, IATF16949, QHSE
OEM/ODM Availability
Yes
  • Factory CNC Steel Casting Cast Steel Parts Casting Processing
  • Factory CNC Steel Casting Cast Steel Parts Casting Processing
  • Factory CNC Steel Casting Cast Steel Parts Casting Processing
  • Factory CNC Steel Casting Cast Steel Parts Casting Processing
  • Factory CNC Steel Casting Cast Steel Parts Casting Processing
  • Factory CNC Steel Casting Cast Steel Parts Casting Processing
Find Similar Products

Basic Info.

Model NO.
OEM
Molding Technics
Investment Casting, Investment Casting
Application
Machinery Parts, Hardware,Auto Parts and So on, Machinery Parts
Material
Carbon Steel, Stainless Steel, Alloy Steel, Bronze, Stainless Steel
Surface Preparation
Shot Blating, Bead Blasting, Powder Coating, Sand Blast
Surface Roughness
Ra3.2, Ra6.3
Machining Tolerance
+/-0.01mm, +/-0.15mm
Standard
ASTM, DIN
Certification
CE, RoHS, ISO 9001:2000, CE, RoHS, ISO 9001:2000
Casting Tolerances
CT4-CT6
Certificate
ISO9001 SGS
Weight Range
0.5-100 Kg
Surface Finish
Shot Blasting, Powder Costing, Polishing, Brushed.
Supply Ability
150 Tons Per Month
Quality Control
Professional QC and Test Equipment
Heat Treatment
Nnealing, Normalizing, Quenching, Tempering
Machining Type
CNC Turning Milling Drilling Lathe
Use
Furniture Hardware, Machinery, Auto, Industry...
Origine
Qingdao
Delivery Time
25-30days
Package
N Pallet or as Your Requirement
Drawing Format
Step/Pdf/Igs/STP/Dwg...
Export Market
Global
Payment
T/T, Paypal, West Union
Transport Package
Bubble Bags+Cartons+Wooden Case/Pallets
Specification
40*10*10
Trademark
OEM
Origin
China
Production Capacity
150 Ton/Month

Product Description

Factory CNC Steel Casting Cast Steel Parts Casting Processing
Product Description

    R&D
Softward: Solidworks, CAD,  Procast,  UG
Development cycle of samples: 25-35 days
Materials
Stainless steel: 304/304L, 316/316L, 410/416 etc
Duplex stainless steel: 2250, 2507, Zeron 100 etc
Carbon steel
Alloy steel
Technical Parameter
Part weight: 2g to 30kgs
Max dimension : 600mm for diameter or length
Min wall thickness : 1.5mm
Casting roughness: Ra3.2-6.4       Machining roughness: Ra1.6
Tolerance of casting: CT6
Inner core: ceramic core, urea core, water soluble wax core.
Heat treatment
Normalzing, Tempering, Quenching, Annealing,  Quenching & Tempering, Caburization,    Solution treatment.
Surface treatment
Polishing, bead blasting, zinc plating, hot dip galvanized, nickel plating, passivation,          
Electro-polising, mirror polishing, Brush polishing,  PE coating, Powder coating, etc
Inspection
Cleanliness inspection, X-Ray radiographic inspection, MIM inspection
Production capacity
More than 120 tons per month
Quality Certificates
ISO9001:2015
IATF 16949.
Factory CNC Steel Casting Cast Steel Parts Casting ProcessingFactory CNC Steel Casting Cast Steel Parts Casting Processing



Investment Casting Process (Lost Wax Casting)


Factory CNC Steel Casting Cast Steel Parts Casting Processing
Factory CNC Steel Casting Cast Steel Parts Casting ProcessingFactory CNC Steel Casting Cast Steel Parts Casting Processing

Surface treatment

Factory CNC Steel Casting Cast Steel Parts Casting Processing

QC Inspection

We have the chemical elements analysis centre and the mechanical testing centre which include the following quality control measures:
Spectrographic analysis, magnaflux crack detection, ultrasonic detection, dynamic fatigue testing, hardness testing, proof and ultimate breaking strength test... TUV DIN EN ISO 9001: 2000 & ISO/TS16949 available

In order to ensure the quality of the orders,
our independent QC members to carry out strict inspection at each stage:
(1)Incoming material inspection
(2)Inspection of work-in-progress
(3)Finished product inspection
(4)Random warehouse inspections
 Factory CNC Steel Casting Cast Steel Parts Casting Processing
Factory CNC Steel Casting Cast Steel Parts Casting ProcessingFactory CNC Steel Casting Cast Steel Parts Casting Processing
Factory CNC Steel Casting Cast Steel Parts Casting Processing



Packing and Delivery

Any requirement on packing, please feel free to let us know

Factory CNC Steel Casting Cast Steel Parts Casting Processing
Factory CNC Steel Casting Cast Steel Parts Casting Processing
Factory CNC Steel Casting Cast Steel Parts Casting Processing
                     
Packing instruction
Factory CNC Steel Casting Cast Steel Parts Casting Processing

1.How can I get the quotation?
Please give us your drawing,quantity,weight and material of the product.

2.If you don't have the drawing,can you make drawing for me?
Yes,we are able to make the drawing of your sample duplicate the sample.

3.When can I get the sample and your main order time?
Sample time: 35-40 days after start to make mold. Order time: 35-40 days, the accurate time depends on product.

4.What is your payment method?
Tooling:100% T/T advanced Order time:50% deposit,50%to be paid before shipment.

5.Which kind of file format you can read?
PDF, IGS, DWG, STEP, MAX

6.What is your surface treatment?
Including: powder coating, sand blasting, painting, polishing, acid pickling, anodizing, enamel, zinc plating, hot-dip galvanizing, electrophoresis, chrome plating.

7.What is your way of packing?
Normally we pack goods according to customers' requirements.

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier