Customization: | Available |
---|---|
Type: | Clay Dry Sand |
Casting Method: | Directional Crystallization |
Still deciding? Get samples of $ !
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Product description
Process | Sand casting |
Common material | iron , Grey iron, Ductile iron, Aluminum, Bronze , ADI |
Technical parameters | Casting weight range:0.6kg-2000kg |
CNC Machined Surface Roughness (Ra/μm): 0.8 | |
Casting Min. Wall Thickness 4mm | |
Casting Min. Linear tolerance 0.2mm | |
Casting Min. Position tolerance: 0.3mm | |
Surface treatment | Sand blasting, shot blasting, painting, polishing, powerd coating , anti-rust plaining ,QPQ or galvanization etc. |
Software | PRO/E, Auto CAD, Solid Works, Ug, CAD, CAM |
Standard | AISI, ASTM, DIN, ISO, BS, JIS |
Packing | A. Plastic Bag+ Carton box |
B. Plastic Bag+ Carton Box + Wooden Case | |
C: Packing according to customer design requirement | |
All our products will be well packed to keep off damage or moisture. | |
Delivery Days | Nomally 30 days after receiving the prepayment, subject to the volume of the practical order. |
2.Sand casting flow chart:
prepare drawing--check drawing--design mould--mechanical molding
--melting and pouring--cooling--sand removal--grinding--sand blast as follow:
3.Sand casting:
Plant has large-scale casting equipment of 50 sets, we have different technology with different type
of sand kind and parts shape. The largest casting we can cast is 15 tons. Our yearly capacity for
sand casting is about 2000 tons for cast steel and 30000 tons for cast iron.
4.Inspection process:
In order to ensure the quality of the orders, our independent QC members to carry out strict inspection
1.) wooden, carton;
2.) pallet;
3.) as customers' requirement.
Please send us information for quote: drawing, material, weight, quantity and request.
Yes, we make the drawing of your sample and duplicate the sample.
Sample: 25-30 days after you start to make mold. The accurate time depends on your product.
Order time: 35-40 days after the payment. The accurate time depends on your product.
Tooling: 100% TT advanced.
Main order: 50% deposit, balance 50% to be paid before shipment.
PDF, ISGS, DWG, STEP, MAX..