Oem Ductile Iron Casting Bolster with Sand Blast for product
1. Product name: Gray Iron sand casting, gray iron casting, ductile iron casting, iron casting, grey iron sand casting parts
2. Casting process: Sand casting, green sand casting, resin sand casting, precoated sand casting.
3. The material for gray iron castings: Gray iron ( grey iron)
4. The quality: We have many method to test the casting part's quality, such as tensile strength, impact test machine and so on.
5. The casting process we have: Precision casting, investment casting, lost wax cating parts, lost foam casting parts, sand casting, green sand casting, silical sol casting parts, water glass casting, casting part, gravity casting and aliminum die casting parts.
6. If you like, you can visit our China casting foundries. And if you would like to know our casting part's price, please email me the iron casting parts drawings.
If interested in, please contact me.
PROCESS |
MATERIAL |
STANDARD |
SAND
CASTING |
Green Sand |
Grey Iron, Ductile Iron, Malleable Iron, Stanless Steel, Carbon, Steel, Aluminium, Brass, Bronze |
ASTM
BS
JIS
DIN
etc |
Furan Resin Sand |
Cold Harden Resin Sand |
INVESTMENT
CASTING |
Sodium Silicone (Water galss) |
Stainless Steel, Carbon Steel, Special Alloy Steel Bronze, Brass, Aluminum |
Silica Sol |
FORGING |
Hammer Forging |
Stainless Steel, Carbon Steel, Alloy Streel, Brass, Aluminum |
Die Forging |
Roll Forging |
STAMPING MACHINING |
STAMPING MACHINING |
All metal material |
FAQ
Q: How can I get the quotation?
A: Please send us the drawing, quantity, weight and material of the product.
Q:If we don't have drawing, can you make drawing for me?
A:Yes, we are able to make the drawing of your samples and duplicate the samples.
Q:What kind of file can you read?
A:PDF, IGS, DWG, STEP,etc...
Q:What is your way of packing?
A:Normally we pack goods according to customers' requirement. For reference: wrapping paper, carton box, wooden case, pallet.
Q:When can I get the samples and your main order time?
A:For samples: 30-40 days after start to make mold. For order: 35-40 days, the accurate time depends on product.
Q:What's your payment term?
A:Tooling: 100% T/T advance. Order: 50% deposit, 50% to be paid before shipment.
Q:Where is the location of your company? Can we visit?
A:We are in Qingdao, China. You are always welcome to visit us.